Fortune | FORTUNE 2024年12月05日
Meta will build a $10 billion AI data center in Louisiana—and Elon Musk is also expanding his own Tennessee AI facility
index_new5.html
../../../zaker_core/zaker_tpl_static/wap/tpl_guoji1.html

 

Meta公司将在路易斯安那州东北部建设一个价值100亿美元的AI数据中心,旨在为该州经济欠发达地区带来发展机遇。然而,该项目也引发了环保组织的担忧,他们担心数据中心对化石燃料的依赖以及由此可能导致的能源价格上涨。与此同时,埃隆·马斯克的AI初创公司xAI也在扩大其位于田纳西州孟菲斯的超级计算机项目,引发了当地居民对污染和环境影响的担忧。这些事件反映了人工智能数据中心建设带来的经济和环境挑战,以及企业社会责任和公众参与的重要性。

😊Meta将在路易斯安那州建设价值100亿美元的AI数据中心,预计将创造500个运营职位和5000个临时建筑职位,并投资2亿美元改善当地基础设施,旨在促进该州经济发展,尤其是在贫困率较高的地区。

🤔该项目依赖于天然气发电,Entergy计划为此建设三座天然气发电厂,但环保组织担心这会导致路易斯安那州居民的能源账单上涨,并加剧化石燃料的依赖。

⚠️xAI在孟菲斯的超级计算机项目也引发了环保担忧,该项目可能加剧当地空气污染,尤其是在以黑人为主的社区,引发了公众对环境正义和透明度的呼吁。

🌎美国数据中心数量不足以满足日益增长的AI需求,预计未来几年将以9%的速度增长,这促使各州竞相吸引大型科技公司建设数据中心。

💡Meta计划未来帮助路易斯安那州电网增加1500兆瓦的可再生能源,以减少对化石燃料的依赖。

The largest artificial intelligence data center ever built by Facebook’s parent company Meta is coming to northeast Louisiana, the company said Wednesday, bringing hopes that the $10 billion facility will transform an economically neglected corner of the state.Republican Gov. Jeff Landry called it “game-changing” for his state’s expanding tech sector, yet some environmental groups have raised concerns over the center’s reliance on fossil fuels — and whether the plans for new natural gas power to support it could lead to higher energy bills in the future for Louisiana residents.Meanwhile, Elon Musk’s AI startup, xAI, is expanding its existing supercomputer project in Memphis, Tennessee, the city’s chamber of commerce said Wednesday. The chamber also said that Nvidia, Dell, and Supermicro Computer will be “establishing operations in Memphis,” without offering further details.Louisiana is among a growing number of states offering tax credits and other incentives to lure big tech firms seeking sites for energy-intensive data centers.The U.S. Commerce Department found that there aren’t enough data centers in the U.S. to meet the rising AI-fueled demand, which is projected to grow by 9% each year through 2030, citing industry reports.Meta anticipates its Louisiana data center will create 500 operational jobs and 5,000 temporary construction jobs, said Kevin Janda, director of data center strategy. At 4 million square feet (370,000 square meters), it will be the company’s largest AI data center to date, he added.“We want to make sure we are having a positive impact on the local level,” Janda said.Congressional leaders and local representatives from across the political spectrum heralded the Meta facility as a boon for Richland parish, a rural part of Louisiana with a population of 20,000 historically reliant on agriculture. About one in four residents are considered to live in poverty and the parish has an employment rate below 50%, according to the U.S. census data.Meta plans to invest $200 million into road and water infrastructure improvements for the parish to offset its water usage. The facility is expected to be completed in 2030.Entergy, one of the nation’s largest utility providers, is fast-tracking plans to build three natural gas power plants in Louisiana capable of generating 2,262 megawatts for Meta’s data center over a 15-year period — nearly one-tenth of Entergy’s existing energy capacity across four states.The Louisiana Public Service Commission is weighing Entergy’s proposal as some environmental groups have opposed locking the state into more fossil fuel-based energy infrastructure. Meta said it plans to help bring 1,500 megawatts of renewable energy onto the grid in the future.Louisiana residents may ultimately end up with rate increases to pay off the cost of operating these natural gas power plants when Meta’s contract with Entergy expires, said Jessica Hendricks, state policy director for the Alliance for Affordable Energy, a Louisiana-based nonprofit advocating for energy consumers.“There’s no reason why residential customers in Louisiana need to pay for a power plant for energy that they’re not going to use,” Hendricks said. “And we want to make sure that there’s safeguards in place.”Public service commissioner Foster Campbell, representing northeast Louisiana, said he does not believe the data center will increase rates for Louisiana residents and views it as vital for his region.“It’s going in one of the most needed places in Louisiana and maybe one of the most needed places in the United States of America,” Foster said. “I’m for it 100%.”Environmental groups have also warned of the pollution generated by Musk’s AI data center in Memphis. The Southern Environmental Law Center, among others, says the supercomputer could strain the power grid, prompting attention from the Environmental Protection Agency. Eighteen gas turbines currently running at xAI’s south Memphis facility are significant sources of ground-level ozone, better known as smog, the group said.Patrick Anderson, an attorney at the law center, said xAI has operated with “a stunning lack of transparency” in developing its South Memphis facility, which is located near predominantly Black neighborhoods that have long dealt with pollution and health risks from factories and other industrial sites.“Memphians deserve to know how xAI will affect them,” he said, “and should have a seat at the table when these decisions are being made.”How many degrees of separation are you from the globe's most powerful business leaders? Explore who made our brand-new list of the 100 Most Powerful People in Business. Plus, learn about the metrics we used to make it.

Fish AI Reader

Fish AI Reader

AI辅助创作,多种专业模板,深度分析,高质量内容生成。从观点提取到深度思考,FishAI为您提供全方位的创作支持。新版本引入自定义参数,让您的创作更加个性化和精准。

FishAI

FishAI

鱼阅,AI 时代的下一个智能信息助手,助你摆脱信息焦虑

联系邮箱 441953276@qq.com

相关标签

AI数据中心 Meta 路易斯安那州 环境保护 能源
相关文章