taiyangnews 08月06日 22:55
Jinko ESS Secures 140MWh Grid-Scale Energy Storage Project in the UK with AGR
index_new5.html
../../../zaker_core/zaker_tpl_static/wap/tpl_guoji1.html

 

Jinko ESS宣布与英国能源开发商AGR Renewables达成协议,将在英国部署一个140MWh的电网级储能项目。该项目将采用28套Jinko ESS的G2 5MWh液冷集装箱系统,预计于2025年11月开始交付,2026年第一季度投入使用。G2系统专为应对英国严峻的自然环境而设计,包括低温和潮湿天气,其先进的液冷技术能保持高效运行和卓越的安全性,并配备AI智能云管理平台优化能源利用。此举标志着Jinko ESS在欧洲市场的地位进一步巩固,也代表了AGR Renewables在英国能源基础设施建设方面的长期承诺。

💡 Jinko ESS将为AGR Renewables在英国提供一个140MWh的电网级储能项目,项目将部署28套G2 5MWh液冷集装箱系统,预计2025年11月开始交付,2026年第一季度完成调试。

🌡️ Jinko ESS的G2系统专为适应英国多变的严酷气候而设计,即使在零下10摄氏度的低温和潮湿环境下,其先进的液冷技术也能确保电芯温度差在±2.5°C以内,并维持超过94%的往返效率。

🛡️ 该G2系统不仅具备IP55防护等级,能抵御雨雪侵袭,还拥有符合国际和当地标准的防多级安全保护设计,确保了卓越的环境保护和操作安全性。

☁️ 系统集成了AI智能云管理平台,能够智能优化充电和放电策略,从而最大化能源利用效率,提升整体储能系统的效能。

🇬🇧 此项目标志着Jinko ESS的技术在英国市场获得了高度认可,进一步巩固了其在欧洲市场的地位,并彰显了其推动全球能源向可再生能源转型的决心。

Jinko ESS, global leading energy storage company and subsidiary of Jinko Solar Co., Ltd., has announced an agreement for a 140MWh grid-scale energy storage project with a leading UK-based energy developer AGR Renewables. The project will feature 28 units of Jinko ESS’s G2 5MWh liquid-cooled containerized systems, with first deliveries scheduled for November 2025 and commissioning set for Q1 2026.

Engineered specifically to endure the UK’s challenging environmental conditions, including -10 ˚C temperatures in high-latitude areas and persistently damp weather, the G2 system combines rugged engineering with intelligent performance. The system features advanced liquid-cooling technology that ensures cell temperature differentials within ±2.5°C, while maintaining over 94% round-trip efficiency even in extreme cold.

The G2 system also meets high standards of environmental protection and operational safety, with an IP55 rating safeguarding against rain and snow, and a multi-level safety protection design compliant with both international and local standards. Furthermore, its integrated AI Smart Cloud Management Platform optimises charge and discharge strategies to maximise energy utilization. “This project collaboration marks a high level of recognition of Jinko ESS’s technology in the UK market,” said Roberto Murgioni, General Manager of Jinko ESS Europe. “The G2 system is uniquely suited to UK conditions and will play a significant role in supporting the nation’s clean energy transition.”

This milestone strengthens Jinko ESS’s position in the European market and underscores its commitment to delivering reliable, efficient, and intelligent energy storage solutions to accelerate the global shift toward renewable energy.

“We are pleased to partner with one of the industry’s leading utility scale battery storage system suppliers to support the delivery of our growing portfolio in the UK. Securing this contract marks a significant milestone in de-risking project delivery and reinforces AGR’s long term vision and commitment to advancing energy storage infrastructure within the UK y, says Oliver Breidt, founder of AGR.

Fish AI Reader

Fish AI Reader

AI辅助创作,多种专业模板,深度分析,高质量内容生成。从观点提取到深度思考,FishAI为您提供全方位的创作支持。新版本引入自定义参数,让您的创作更加个性化和精准。

FishAI

FishAI

鱼阅,AI 时代的下一个智能信息助手,助你摆脱信息焦虑

联系邮箱 441953276@qq.com

相关标签

Jinko ESS AGR Renewables 储能项目 英国 可再生能源
相关文章