taiyangnews 07月29日 01:20
Jinko ESS Secures 140MWh Grid-Scale Energy Storage Project in the UK with AGR
index_new5.html
../../../zaker_core/zaker_tpl_static/wap/tpl_guoji1.html

 

Jinko ESS宣布与英国能源开发商AGR Renewables达成一项140MWh的电网级储能项目协议。该项目将部署28套Jinko ESS的G2 5MWh液冷集装箱系统,预计于2025年11月开始交付,2026年第一季度投入使用。G2系统专为应对英国严苛的气候条件设计,具备出色的耐寒和防潮性能,即使在零下10摄氏度的低温下也能保持超过94%的往返效率。系统还通过IP55防护等级和多重安全设计确保了高标准的环保与运行安全,并集成AI智能云管理平台优化能源利用。

💡 Jinko ESS的G2 5MWh液冷集装箱系统将构成此140MWh储能项目的主体,共计部署28套。该系统专为适应英国多雨和极寒(最低可达-10°C)等严峻环境而设计,显示了其在恶劣条件下的可靠性。

💧 G2系统采用先进的液冷技术,能够将电池单元的温差控制在±2.5°C以内,即使在极寒环境下也能保持超过94%的往返效率,确保了储能系统的稳定性和性能表现。

🛡️ 该系统在环保和安全方面达到高标准,具备IP55防护等级,可抵御雨雪侵袭,并采用了符合国际和本地标准的“多层次安全防护设计”,保障了储能设施的运行安全。

☁️ 集成的AI智能云管理平台是G2系统的另一亮点,该平台能够优化充电和放电策略,从而最大限度地提高能源利用效率,实现智能化的能源管理。

🤝 此项目标志着Jinko ESS的技术在英国市场获得了高度认可,并进一步巩固了其在欧洲市场的地位,有助于加速全球向可再生能源的转型。

Jinko ESS, global leading energy storage company and subsidiary of Jinko Solar Co., Ltd., has announced an agreement for a 140MWh grid-scale energy storage project with a leading UK-based energy developer AGR Renewables. The project will feature 28 units of Jinko ESS’s G2 5MWh liquid-cooled containerized systems, with first deliveries scheduled for November 2025 and commissioning set for Q1 2026. 

Engineered specifically to endure the UK’s challenging environmental conditions, including -10 ˚C temperatures in high-latitude areas and persistently damp weather, the G2 system combines rugged engineering with intelligent performance. The system features advanced liquid-cooling technology that ensures cell temperature differentials within ±2.5°C, while maintaining over 94% round-trip efficiency even in extreme cold. 

The G2 system also meets high standards of environmental protection and operational safety, with an IP55 rating safeguarding against rain and snow, and a multi-level safety protection design compliant with both international and local standards. Furthermore, its integrated AI Smart Cloud Management Platform optimises charge and discharge strategies to maximise energy utilization. “This project collaboration marks a high level of recognition of Jinko ESS’s technology in the UK market,” said Roberto Murgioni, General Manager of Jinko ESS Europe. “The G2 system is uniquely suited to UK conditions and will play a significant role in supporting the nation’s clean energy transition.”  

This milestone strengthens Jinko ESS’s position in the European market and underscores its commitment to delivering reliable, efficient, and intelligent energy storage solutions to accelerate the global shift toward renewable energy. 

“We are pleased to partner with one of the industry’s leading utility scale battery storage system suppliers to support the delivery of our growing portfolio in the UK. Securing this contract marks a significant milestone in de-risking project delivery and reinforces AGR’s long term vision and commitment to advancing energy storage infrastructure within the UK y, says Oliver Breidt, founder of AGR. 

Fish AI Reader

Fish AI Reader

AI辅助创作,多种专业模板,深度分析,高质量内容生成。从观点提取到深度思考,FishAI为您提供全方位的创作支持。新版本引入自定义参数,让您的创作更加个性化和精准。

FishAI

FishAI

鱼阅,AI 时代的下一个智能信息助手,助你摆脱信息焦虑

联系邮箱 441953276@qq.com

相关标签

Jinko ESS AGR Renewables 储能项目 可再生能源 英国市场
相关文章