Ars Technica - All content 19小时前
xAI data center gets air permit to run 15 turbines, but imaging shows 24 on site
index_new5.html
../../../zaker_core/zaker_tpl_static/wap/tpl_guoji1.html

 

xAI在面临环境污染争议后,其位于孟菲斯的数据中心获得空气许可,允许使用15台甲烷气体涡轮机,并需遵守限制以减少排放。

After months of backlash over alleged pollution concerns, xAI has finally secured an air permit covering some of the methane gas turbines powering its Colossus supercomputer data center in Memphis, Tennessee.

On Wednesday, the Shelby County Health Department granted xAI an air permit that allows it to power 15 gas turbines while adhering to a range of restrictions designed to minimize emissions. Expiring on January 2, 2027, the permit requires xAI to install and operate the best available control technology (BACT) by September 1 to ensure emissions do not exceed certain limits.

Any failure to comply could trigger enforcement actions by the Environmental Protection Agency or the county health department, the permit notes.

Read full article

Comments

Fish AI Reader

Fish AI Reader

AI辅助创作,多种专业模板,深度分析,高质量内容生成。从观点提取到深度思考,FishAI为您提供全方位的创作支持。新版本引入自定义参数,让您的创作更加个性化和精准。

FishAI

FishAI

鱼阅,AI 时代的下一个智能信息助手,助你摆脱信息焦虑

联系邮箱 441953276@qq.com

相关标签

xAI 数据中心 空气许可 环境排放 甲烷气体
相关文章