taiyangnews 10小时前
Jinko ESS Signs 100MWh Energy Storage Project in Greece
index_new5.html
../../../zaker_core/zaker_tpl_static/wap/tpl_guoji1.html

 

晶科能源(Jinko ESS)宣布与希腊一家重要客户成功签署100MWh储能项目。该项目将部署20套晶科ESS G2 5MWh液冷储能系统,分布在希腊的20个不同项目地点。这些系统专为四小时长时储能设计。交付计划于2025年11月中旬开始。此举标志着晶科能源在欧洲分布式储能领域的持续扩张,支持希腊构建灵活、稳定的清洁能源电网。该系统具有94%的往返效率,通过削峰填谷、负荷转移和可再生能源整合,显著提升电力系统的经济性和可靠性。

⚡️项目概况:晶科能源将向希腊交付20套G2 5MWh液冷储能系统,总容量100MWh,分布在20个不同地点,计划于2025年11月中旬开始交付。

💡技术特点:G2 5MWh系统采用液冷技术,确保电池温差在±2.5°C以内,并配备多层防火隔离和热失控预警系统,提供三重保护。其四小时长时储能设计有助于电网的削峰填谷和可再生能源整合,往返效率高达94%。

🌍应用与效益:该系统采用模块化集装箱结构,适应希腊地形,缓解区域电网拥堵,加速风能和太阳能利用。结合晶科能源的能源管理云平台,实现对20个地点的实时监控和充放电策略优化。其定向冷却技术可减少20%的辅助能耗,预计每年可为运营商节省数万欧元运营成本。

Jinko ESS, the global leading energy storage company recently announced the successful signing of a 100MWh energy storage project with a key client in Greece. The project will deploy 20 sets of Jinko ESS G2 5MWh liquid-cooled energy storage systems (configured for four-hour long-duration storage), distributed across 20 distinct project sites throughout Greece. Deliveries are scheduled to commence in mid-November 2025. This collaboration marks Jinko ESS’s continued expansion in Europe’s distributed energy storage sector, supporting Greece’s efforts to build a flexible and stable clean energy grid.

The Jinko ESS G2 5MWh system delivers a leading 94% round-trip efficiency, with its four-hour long-duration design enabling active participation in grid peak shaving, load shifting, and renewable energy integration, significantly enhancing power system economics and reliability. The modular containerized structure aligns with Greece’s mountainous terrain and scattered island geography, allowing flexible deployment across 20 sites to alleviate regional grid congestion and accelerate local wind and solar energy utilization. The system employs liquid cooling technology to maintain cell temperature differentials within ±2.5°C, combined with multi-layer fire-resistant isolation compartments and a thermal runaway early-warning system, providing triple-layer protection from cells to racks and the entire system, ensuring high reliability for frequent operational maintenance.

Integrated with Jinko ESS’s proprietary Energy Management cloud platform, the system enables real-time monitoring of all 20 sites and optimizes charge-discharge strategies. Its on-demand directional cooling technology reduces auxiliary energy consumption by 20% compared to conventional solutions. Coupled with the revenue advantages of the four-hour long-duration configuration, the system is projected to save operators tens of thousands of euros in annual operational costs.

Roberto Murgioni, General Manager of Jinko ESS Europe, stated: “Greece is accelerating progress toward its ‘70% renewable energy by 2030’ target. This innovative multi-site project not only demonstrates the G2 5MWh system’s adaptability to diverse scenarios but also delivers a cost-effective Jinko solution for Europe’s energy transition.”

Fish AI Reader

Fish AI Reader

AI辅助创作,多种专业模板,深度分析,高质量内容生成。从观点提取到深度思考,FishAI为您提供全方位的创作支持。新版本引入自定义参数,让您的创作更加个性化和精准。

FishAI

FishAI

鱼阅,AI 时代的下一个智能信息助手,助你摆脱信息焦虑

联系邮箱 441953276@qq.com

相关标签

晶科能源 储能项目 希腊 液冷储能 可再生能源
相关文章