taiyangnews 04月21日 03:33
JA Solar Delivers 1GW DeepBlue 4.0 Pro Modules for Landmark Desert PV Project in Inner Mongolia
index_new5.html
../../../zaker_core/zaker_tpl_static/wap/tpl_guoji1.html

 

晶澳太阳能近期开始向内蒙古乌拉特前旗的苏吉沙地光伏项目交付1吉瓦DeepBlue 4.0 Pro高效光伏组件。该项目是中国大型风光电基地项目的第三阶段的一部分,旨在响应全球碳中和目标,致力于在沙漠地区进行生态修复。DeepBlue 4.0 Pro组件专为极端环境条件设计,已在库布其沙漠、乌兰布和沙漠和科尔沁沙地等类似沙漠项目中展现出优异性能。该项目预计于2025年底完工,占地超过42,000英亩,预计每年发电29.6亿千瓦时,每年可节省约90万吨标准煤,减少268万吨二氧化碳排放。

🌱 晶澳太阳能已开始向内蒙古苏吉沙地光伏项目交付DeepBlue 4.0 Pro高效光伏组件,此举是响应中国大型风光电基地倡议的一部分,旨在推动全球碳中和目标。

☀️ DeepBlue 4.0 Pro组件专为沙漠等极端环境设计,能够承受高紫外线辐射、频繁沙尘暴和剧烈温度变化等挑战,确保光伏项目在恶劣环境中的可靠运行。

🌳 苏吉沙地光伏项目预计于2025年底完工,占地超过42,000英亩,每年发电量将达到29.6亿千瓦时,从而显著减少煤炭消耗和二氧化碳排放。

🌿 该项目采用“光伏+生态修复”模式,通过在组件下方种植植物,构建微生态系统,以对抗沙漠化,实现能源生产与环境保护的协同发展。

JA Solar has recently begun the delivery of 1GW DeepBlue 4.0 Pro high-efficiency PV modules to the Suji Sandland PV project in Urad Front Banner, Inner Mongolia. The project is part of the third phase of China's large-scale wind and solar power base initiatives, aligned with global carbon neutrality targets and committed to ecological restoration in desert-prone regions.

Located in Inner Mongolia, Suji Sandland is one of the many desert zones that pose ecological and environmental challenges. The deployment of JA Solar's DeepBlue 4.0 Pro modules marks a critical step toward transforming the arid land into a sustainable source of clean energy, supporting the area's green transition.

Designed for reliable performance in extreme environmental conditions, the DeepBlue 4.0 Pro module has demonstrated excellent performance in similar desert projects including the Kubuqi Desert, Ulan Buh Desert, and Horqin Sandy Land. The module is engineered to withstand high ultraviolet radiation, frequent sandstorms, and large temperature fluctuations—factors that often pose risks to PV projects in deserts.

"This project demonstrates how advanced PV technologies contribute to clean energy and ecological recovery in harsh desert environments," said Aiqing Yang, Executive President of JA Solar. "We are proud that our DeepBlue 4.0 Pro modules are helping turn vast stretches of sand into valuable green assets supporting environmental goals."

Upon its expected completion by the end of 2025, the project will span over 42,000 acres and is expected to generate 2.96 billion kWh electricity annually. This will save approximately 900,000 tons of standard coal and reduce carbon dioxide emissions by 2.68 million tons per year. In addition to power generation, the project incorporates an innovative "PV + ecological restoration" model, using under-module planting to help build a micro-ecosystem and combat desertification.

By integrating advanced solar PV technologies with sustainable land use, JA Solar supports the development of large-scale renewable energy projects that contribute to global efforts in energy transformation and ecological protection.

Fish AI Reader

Fish AI Reader

AI辅助创作,多种专业模板,深度分析,高质量内容生成。从观点提取到深度思考,FishAI为您提供全方位的创作支持。新版本引入自定义参数,让您的创作更加个性化和精准。

FishAI

FishAI

鱼阅,AI 时代的下一个智能信息助手,助你摆脱信息焦虑

联系邮箱 441953276@qq.com

相关标签

晶澳 光伏 沙漠治理 生态修复
相关文章