TechCrunch News 01月17日
Rivian finalizes $6.6B loan for its Georgia factory
index_new5.html
../../../zaker_core/zaker_tpl_static/wap/tpl_guoji1.html

 

Rivian在特朗普就职前夕获得了美国能源部66亿美元的贷款,用于在佐治亚州建设新工厂。该贷款来自先进技术汽车制造项目,类似于2009年特斯拉获得的救命贷款。Rivian计划分两阶段使用这笔贷款,第一阶段可借33.5亿美元,第二阶段可借26.2亿美元。为获得资金,Rivian需满足多项条件,包括在伊利诺伊州工厂销售一定数量的R2 SUV,并达到R2和R3的设计里程碑。尽管最初计划在2024年投产,但由于成本削减,Rivian暂停了佐治亚工厂的建设,现在计划在2028年投产。这笔贷款引发了一些争议,但Rivian认为这有助于其实现生产目标。

💰 Rivian获得美国能源部66亿美元贷款,用于在佐治亚州建设新工厂,该贷款来自先进技术汽车制造项目,与特斯拉曾获得的贷款类似。

🏭 Rivian计划分两阶段使用贷款,第一阶段可借33.5亿美元,第二阶段可借26.2亿美元,剩余资金用于消除贷款利息,工厂建设预计在2026年开始,首批R2 SUV计划于2028年下线。

🚗 Rivian为获得贷款需满足多项条件,包括销售一定数量的R2 SUV,并达成R2和R3的设计里程碑,原计划2024年投产的佐治亚工厂因成本削减而推迟至2028年。

Rivian and the Department of Energy have finalized a $6.6 billion loan announced in November with just a few days left until Donald Trump’s inauguration. The company will use the loan to help build out its planned factory in Georgia, east of Atlanta, with construction beginning in 2026. The first R2 SUVs are scheduled to come off the line in 2028.

The loan comes from the Advanced Technology Vehicle Manufacturing (ATVM) program, part of the DOE’s Loan Programs Office. ATVM is most well-known as the program that gave Tesla a $465 million lifeline in 2009.

Rivian’s loan drew criticism from Vivek Ramaswamy, who is supposed to be co-leading the so-called “department of government efficiency” with Elon Musk after Trump takes office. Ramaswamy said he’d look to claw back the loan, though it is unclear how he would try that, and neither he nor Musk have explained exactly how they play to structure and operate their new effort.

The loan comes in two tranches, which Rivian says it will use to fund the two stages of buildout it’s planning in Georgia. Rivian can borrow up to $3.35 billion in the first tranche, and up to $2.62 billion in the second tranche. (The remaining $600 million goes towards eliminating interest on the loan.)

Rivian has 52 months to start drawing money from the agreement. It has also made a number of promises to the DOE that it must satisfy to access the funds. The company has to sell at least a certain number of the upcoming R2 SUVs that will be built at its Normal, Illinois factory. (The exact number is redacted in the loan agreement.) It also has to hit certain product design milestones on the R2 and R3 hatchback.

Rivian first announced plans for the Georgia factory in December 2021, just a few weeks after the company’s blockbuster IPO. It originally claimed that it would start production at the yet-to-be-built facility in 2024. But last year, in a bid to cut costs, Rivian paused construction on the factory and decided to build the R2 in Illinois instead. Armed with the DOE loan, Rivian now believes it can roll new vehicles off the line at the plant four years later than originally planned.

Fish AI Reader

Fish AI Reader

AI辅助创作,多种专业模板,深度分析,高质量内容生成。从观点提取到深度思考,FishAI为您提供全方位的创作支持。新版本引入自定义参数,让您的创作更加个性化和精准。

FishAI

FishAI

鱼阅,AI 时代的下一个智能信息助手,助你摆脱信息焦虑

联系邮箱 441953276@qq.com

相关标签

Rivian 能源部贷款 电动汽车 R2 SUV 工厂建设
相关文章