taiyangnews 2024年12月19日
AUD 1.4B Debt Tranche For Neoen RE Portfolio Expansion In Australia
index_new5.html
../../../zaker_core/zaker_tpl_static/wap/tpl_guoji1.html

 

法国可再生能源独立发电商Neoen在澳大利亚获得14亿澳元债务融资,用于支持其可再生能源资产组合。该融资由11家澳洲和国际银行组成的财团提供,支持1.3吉瓦的太阳能、风能和储能项目,包括三个在建新项目。此次融资使Neoen在澳大利亚的融资总额超过20亿澳元,覆盖15个在运营或建设中的项目,总容量达2.9吉瓦。该融资基于长期合同确保了稳定的收入来源,并因其多元化的资产组合和跨多个州的布局而受到投资者欢迎,为Neoen未来项目融资奠定了基础。

🔋 西部丘陵电池一期项目:位于昆士兰州,拥有270兆瓦/540兆瓦时的电池系统,并签订了多个虚拟存储容量合同。

☀️ 卡尔凯恩太阳能发电场:位于新南威尔士州,440兆瓦峰值的太阳能发电场正在建设中,预计2026年投入使用。一半的能源输出已与Smartest Energy达成4年协议,并获得新南威尔士州政府的长期能源服务协议支持。

⚡ 科利电池二期项目:位于西澳大利亚州,容量为341兆瓦/1363兆瓦时,与澳大利亚能源市场运营商签订了容量合同。该项目正在建设中,预计2025年第四季度投入使用。

💰 此轮融资由11家领先的澳大利亚和国际贷款机构提供,包括澳新银行、中国银行等,总额超过20亿澳元,支持共计15个在运营或建设中的项目。

French renewable energy independent power producer (IPP) Neoen has closed a new AUD 1.4 billion debt tranche. Backed by a portfolio of renewable energy assets in Australia, the company has more than doubled the amount of its financing with this debt tranche.Speaking about the transaction, Jean-Christophe Cheylus, Managing Director of Neoen Australia, said: “We are very pleased to announce today the closing of the second tranche of this financing of our portfolio of assets and we sincerely thank all our lenders for their continued confidence and commitment to us. This transaction demonstrates the unrivalled depth of our portfolio in Australia. It will allow us to strengthen our business model of owning and operating our own assets and provides a solid foundation for our future growth.”With maturities of 5.5 and 7 years, this tranche supports 1.3 GW of solar, wind and storage projects, including 3 new assets – 2 of which are under construction. Here are the details:Western Downs Battery - Stage 1: Located in Queensland, this project features a 270 MW / 540 MWh battery system, and has multiple virtual storage capacity contractsCulcairn Solar Farm: Situated in New South Wales, this 440 MWp solar farm is currently under construction and scheduled for commissioning in 2026. Half of its energy output has been sold to Smartest Energy under a 4-year agreement, while the project is also backed by a Long-Term Energy Services Agreement (LTESA) with the New South Wales GovernmentCollie Battery - Stage 2: The 2nd phase of the Collie Battery project in Western Australia will have a capacity of 341 MW / 1,363 MWh. It operates under a capacity contract with the Australian Energy Market Operator (AEMO). Currently under construction, the project is on track for commissioning in Q4 2025The first financing concluded in February 2024. Now, both debt tranches together exceed AUD 2 billion and are backed by a portfolio of 15 assets in operation or under construction with a cumulative capacity of 2.9 GW.Driven by the high proportion of long-term contracts that ensure stable revenue streams, this financing has been well received by the investors. The diversification of the portfolio, spanning solar, wind, and storage technologies, as well as the fact that it is spread across multiple Australian states, has added to the appeal. This now positions Neoen to raise additional debt for future projects.This funding was provided by a consortium of 11 leading Australian and international lenders: ANZ, Bank of China, the Clean Energy Finance Corporation, The Hongkong & Shanghai Banking Corporation, ING, KfW IPEX-Bank, Mizuho, MUFG, SMBC, Société Générale, and Westpac.

Fish AI Reader

Fish AI Reader

AI辅助创作,多种专业模板,深度分析,高质量内容生成。从观点提取到深度思考,FishAI为您提供全方位的创作支持。新版本引入自定义参数,让您的创作更加个性化和精准。

FishAI

FishAI

鱼阅,AI 时代的下一个智能信息助手,助你摆脱信息焦虑

联系邮箱 441953276@qq.com

相关标签

Neoen 可再生能源 澳大利亚 项目融资 储能
相关文章